ABUIABAEGAAggOyYyQUoqLmlnAQwFzgY

18001132774

The standardization work of energy field has been issued as the development direction of instrument

2017-08-21 00:00Source:中国测控网Views:18times

The day before, the General Department of the National Energy Board issued the "2017 points of energy industry standard" (hereinafter referred to as "points"). Energy industry is an important application of instrumentation industry, the "work points" introduced, but also for the instrument industry pointed out the future direction of development.

"Points" pointed out that in 2017 the focus on the following work, improve the energy standardization management system; to strengthen top-level design and system layout; to strengthen key areas of revised standard system; improve the level of international energy standards.

The key areas of energy included in the main points of work include oil and gas, petrochemical, nuclear power, power, power equipment, renewable energy, coal and so on. With the strengthening of the energy field of standardization construction, instrumentation data corresponding to the accuracy of synchronous lifting, to provide strong technical support for energy measurement, show the core competitiveness in the future energy measurement market.

In addition, "points", strengthen the development of oil and gas exploration and development, oil and gas pipeline construction, offshore oil exploration and production equipment quality and operation safety of industry standards, promote natural gas metering supporting standards with international standards.

In the process of gas exploration and development and energy metering, instruments such as natural gas flowmeter and natural gas analyzer play an irreplaceable important role. In terms of natural gas measurement standards, China has now formed the "natural gas flow standard orifice plate measurement method" (SY/T6143-1996) and other standards. However, compared with the international advanced level, there is still a significant gap in the overall technical level of China's natural gas flow measurement. For example, the natural orifice flowmeter used in our country is easy to cause signal delay because of its inherent defects. Therefore, the accuracy of measurement cannot be guaranteed. Believe that the "work points" released, will greatly promote the natural gas flow meters, analyzers and other measuring, monitoring instruments, technical progress.

"Work points" also proposed to strengthen the use of energy, information collection and other aspects of standard construction. Smart meter is an important part in the construction of power information collection system. Thanks to the rapid development of smart grid construction, China's smart meter industry developed rapidly, and now the industry has been more mature, the technology level in the global market has advantages. With the gradual construction of energy information collection standards, higher requirements for the future performance and quality of smart meters are put forward, and intelligent and accurate will become the future trends of smart meters.

In the field of coal, the key coal products in the field of key product standards, key equipment and standards and energy efficiency standards for key energy consuming units are studied. At present, China's coal monitoring and analysis instruments generally exist the problem of poor adaptability and poor reliability, which has a certain impact on the standardization of China's coal industry. Therefore, strengthening the research and development of key technologies and improving the reliability and adaptability of coal monitoring and analysis instruments are the focus of the instrument enterprises in our country.

In addition, "working point" in this thesis, to strengthen the field of power equipment important technical standards development and system construction, to adapt to the "Internet plus wisdom energy", "Chinese manufacturing 2025" relevant requirements, promote the establishment of a new standard system for electric power equipment. After more than ten years' development, the intelligent electric power meter in our country is approaching mature, and its function is gradually changing from simple and low-end to multiplex and high-end. The implementation of the main points of work will further promote the accuracy, performance, stability, communication means and protocol openness and other technical level.

The "work points" released, clear 2017 areas of industry standardization construction points for the relevant industry layout direction, and also will become the focus of attention of some instrumentation enterprises.

As China's attention to the energy sector has improved, the instrument and meter industry, as a pioneer in the field of energy metering and testing, will usher in new opportunities for development. Seize the opportunity, according to the "points", adjust the future business focus, enhance energy measurement, detection and analysis instrument equipment R & D, will urge the relevant enterprises and downstream instruments, at the forefront of the industry.